Cabinetry, millwork and the rooms they belong to
10 services, all delivered the same way: measured on site, drawn before it is built, and coordinated from design through installation. Based in North York, working across the Greater Toronto Area.
Cabinetry for the rooms that do the most work
Kitchens
Kitchen cabinetry drawn to your room, your appliances and the way your household actually cooks.
Custom Kitchen CabinetsBuilt-ins
Cabinetry that fills the alcove properly — floor to ceiling, wall to wall, with no gap collecting dust behind it.
Built-In CabinetryMedia walls
A wall that holds the screen, the equipment, the cables and the clutter — and still looks like part of the room.
Media Walls & Entertainment UnitsVanities
Vanities made to the room's actual width, with drawer storage designed around the plumbing instead of blocked by it.
Bathroom VanitiesHome offices
Desks and shelving built into the room, with the cables, printer and paperwork designed in rather than added later.
Home Office Cabinetry
Millwork that treats the room as one surface
Storage planned around what you actually own
Closets
Closet interiors planned from an inventory of what you actually hang, fold and store — not from a standard kit.
Custom ClosetsMudrooms
Entry storage built for the reality of a Toronto winter: wet boots, heavy coats and four people arriving at once.
Mudroom CabinetryLaundry rooms
Counters at the right height, storage above the machines you can actually reach, and somewhere for things to dry flat.
Laundry Room Cabinets
Commercial fit-out and casework
The same process, whatever the scope
A single vanity and a whole-house millwork package run through the same five stages. The scale changes; the accountability does not.
- 01
Initial conversation
Tell us about the space. We tell you what is involved and what it depends on.
A phone call or a video call, usually 20 to 30 minutes
- 02
Site consultation and measurements
We measure the room properly — including everything that is out of square.
Typically 45 to 90 minutes on site
- 03
Design and material selection
Drawings you can read, and a written scope listing every cabinet.
Usually one to three weeks, depending on how many revisions you want
- 04
Production and scheduling
Manufacturing runs while we lock in dates, access and the other trades.
Typically four to eight weeks, depending on scope and finish
- 05
Installation and final review
Installed, adjusted, and walked through together — with anything outstanding in writing.
One to four days on site for most residential projects
Tell us what you want to build
Send us the room, a rough idea, or three photographs on your phone. We will tell you what is involved, what it depends on, and what it is likely to take — before anyone talks about price.